Tag Archive for 'tax credit'

PECO Rebate

PECO Smart Home Rebate Program

Still on until the END of 2010! Call us now

PECO has announced the Smart Home rebate program. This program is retroactive to July 1st, 2009.  More information can be found online at http://www.pecosmartideas.com,   OR by calling Ervin-Moser Service at 610-430-0606.

Qualifying Equipment Rebates (contractor installed)

Central Heating, Cooling & Water Heating

CENTRAL AC
14.5
- 14.99 SEER
$150 per unit
ENERGY STAR CENTRAL AC
15.0 - 15.99 SEER
$225 per unit
ENERGY STAR CENTRAL AC
16.0+ SEER
$300 per unit
AIR-SOURCE HEAT PUMP
14.5 - 14.99 SEER
$250 per unit
ENERGY STAR AIR-SOURCE HEAT PUMP
15.0 - 15.99 SEER
$325 per unit
ENERGY STAR AIR-SOURCE HEAT PUMP
16.0+ SEER
$400 per unit
ENERGY STAR GEOTHERMAL HEAT PUMP - 3.3 COP or greater $217 per ton
ENERGY STAR HIGH-EFFICIENCY GAS FURNACE - 90% AFUE or higher

(replacing Electric Base Board or Electric Furnace)

$1,000 per unit
ENERGY STAR HIGH-EFFICIENCY GAS FURNACE - 90% AFUE or higher

(replacing Electric Heat Pump)

$550 per unit
ENERGY STAR HIGH-EFFICIENCY GAS WATER HEATER - .62 EF or higher

(replacing Electric Hot Water Heater)

$250 per unit
ENERGY STAR NATURAL GAS FURNACE
90% AFUE or higher
$300 per unit
ENERGY STAR NATURAL GAS BOILER
85% AFUE or higher
$300 per unit
ENERGY STAR NATURAL GAS STORAGE TANK WATER HEATER
.62 EF or higher (.67 as of 9/1/2010)
$50 per unit
SEER is Seasonal Energy Efficiency Ratio; AFUE is Annual Fuel Utilization Efficiency; EF is Energy Factor;
COP is Coefficient of Performance

Spring 2010 REBATE program

The Electrical Association of Philadelphia

 

Spring 2010 REBATE PROGRAM

 

$ 300 on a 14.5 to 14.99 SEER, 12.0 EER (8.2 HSPF if heat pump)

central air conditioner / heat pump system

 

$ 500 on a 15.0 to 16.99 SEER, 12.0 EER (8.2 HSPF if heat pump)

central air conditioner / heat pump system

 

$ 700 on a 17.0 or Higher SEER, 12.0 EER (8.2 HSPF if heat pump)

central air conditioner / heat pump system

 

$ 800 on a 18 EER geothermal heat pump system (or higher)

 

·         Contracts may not be signed before Monday, February 1, 2010

·         Contracts must be signed by Friday, May 14, 2010

·         Systems must be installed by Friday, May 28, 2010